Drone Survey in Dubai Global Village

Over the course of any construction project, the workspace changes. Change is a normal and expected part of the construction process. Beyond executing the change in the field, the change normally needs to be documented to show what was actually constructed.


Since Global Village was constructed in 1996 several changes and improvements were made, so they needed to update the As-Built drawings and measure the level-change of the ground according to these constructions. Here comes our part, we in Geotech 3D did a full aerial scanning of the global village with an area of 217 hectares.




  • GEOTECH3D YouTube Channel
  • geotech3d on twitter
  • GEOTECH3D on Instagram
  • GEOTECH3D Facebook Page
  • GEOTECH3D on LinkedIn

By continuing past this page, you agree to our Terms of Service, Cookie Policy, Privacy Policy and Content Policies. All trademarks are properties of their respective owners. © 2010-2020 - GEOTECH3D LLC. All rights reserved.